The DCF code of practice (July 2010) is a document which has been issued by the Regulatory Agencies and contains practical guidance on the stanards that the relationship between a Producers Compliance Scheme (PCS) and Designated Collection Facility (DCF) operator must meet.
Electrolink always makes sure that all parties meet the requirements of this code. Below is a PDF download of the full code of practice: